The master bath is where hillside construction stops being an abstraction. Split level and stepped foundations in Fountain Hills mean the drain line under your primary suite has a defined path and a defined slope, and moving a toilet or relocating a shower drain can mean opening a slab or rerouting a vent stack through a wall you did not plan to open. We assess this before we design, not after. Once we know what the plumbing will tolerate, we design the room you actually want inside those constraints, and we take the TOPPS permit and Sanitary District coordination off your plate entirely.
Hillside drain relocation is frequently possible. It just needs to be priced honestly, because the difference between a straightforward move and a slab cut is significant.

Drain slope, vent location, and slab condition established first. On a hillside floorplan this determines what the room can become before a single line gets drawn.
Whether the tub stays or the whole footprint becomes shower, we lay it out against the plumbing you actually have rather than the plumbing a plan assumes.
Double vanity where the wall supports it, real storage inside it, and finish selections that hold up to daily use and to our water.
Proudly serving Fountain Hills, Rio Verde, Fort McDowell, Scottsdale, Mesa and Paradise Valley for 19+ years.
Ten services built around what Fountain Hills homes actually need. Thirty year old kitchens, garden tubs nobody uses, cabinetry that has spent three decades in low humidity, and view driven floorplans that were never opened up the way they should have been.

Our crews work daily across the Fountain Hills hillside plats and out along the Beeline corridor, so we already know which lots fall under NPOA deed restrictions, which need a TOPPS permit pulled before demolition, and how the Sanitary District wants plumbing relocations coordinated. That local knowledge travels with us into every surrounding community we serve.
Frequently Asked Questions
Kitchen And Bath Remodeling can be complex, and we’re here to provide answers to common questions. Here are some frequently asked questions from our clients.
If your lot is one of roughly 4,100 parcels under the Neighborhood Property Owners Association, exterior changes tied to a remodel do trigger Neighborhood Committee of Architecture review. That includes window openings, patio work, walls, and demolition. The committee meets the first and third Wednesday of each month at 8:30 a.m. and compliance deposits apply. We verify your plat status before we quote.
No, and the difference matters. The NPOA is an Arizona nonprofit corporation enforcing a recorded Declaration of Reservations. It is not a planned community under Arizona's Planned Community Act and it collects no regular dues. What it does hold is architectural authority over your lot, which is why a remodel that changes anything visible from outside needs to move through NCOA before a permit gets pulled.
Structural changes, plumbing relocation, and electrical alterations require a building permit through the Town of Fountain Hills TOPPS system, administered by the Building Safety Division. Cosmetic work such as a straight vanity swap generally does not. If your project relocates a drain or moves a wall, expect a permit and expect Sanitary District coordination on top of it.
The Sanitary District is a separate governmental entity from the Town. Any project that moves plumbing or adds fixture load needs coordination with both bodies, not just one. Homeowners routinely find this out midway through a project, which is exactly the kind of delay we plan around at the front end.
Plan on ten to sixteen weeks of active construction for a full gut, plus four to eight weeks in front for design, cabinet lead time, NCOA review if your plat requires it, and permitting. Hillside lots with structural wall removal run longer. We give you a real calendar before we start, not an optimistic one.
Yes. With a 16.3 percent vacancy rate here, seasonal ownership is normal and summer is our busiest execution window. We handle key access, weekly photo documentation, material approvals by video call, and a full walkthrough when you return. Decisions get made during your occupancy months and executed while the house sits empty.
Often yes, but drain slope and venting decide it. On a slab floorplan a significant relocation may mean cutting concrete, which we price honestly rather than discovering mid project.
Most Fountain Hills homeowners take it out and expand the shower. If nobody in the house has used it in five years, that is your answer.
Only if the work touches something exterior, such as a window. Interior only work does not trigger architectural review, though it may still require a TOPPS permit.
Six to twelve weeks of active work depending on scope and whether plumbing relocates. Tile and glass lead times drive the back end of the schedule.
Master baths on hillside lots have constraints most contractors discover too late. Bring us in early and we will design around them instead of into them.
We pride ourselves on delivering great results and experiences for each client. Hear directly from home and business owners who’ve trusted us with their Kitchen And Bath Remodeling needs.

They pulled the NCOA submission together for us before we ever signed a contract. Our 1994 kitchen had the original oak boxes and a dropped soffit running the whole length of the room. It is unrecognizable now, and the whole thing was permitted properly.
Margaret Ellison, Sunridge Canyon

We live in Minnesota nine months a year. They ran our master bath demo and rebuild while the house was empty, sent photo updates every Friday, and it was finished and clean when we flew back in October. Zero surprises.
Doug Vasquez, Firerock

Converted a garden tub we never used into a curbless walk in shower with grab bar blocking behind the tile. My husband is 74 and it changed how he uses that bathroom. They understood what we needed without us explaining it twice.
Carol Whitfield, Eagles Nest
Ready to hear more about expert services at ?
Contact us today to receive a detailed, no-obligation quote.