Fountain Hills has a median age of 61.5 and 40.8 percent of residents are 65 or older. Aging in place bath design is not a niche offering here, it is the baseline requirement. That means curbless entry so nothing has to be stepped over, blocking behind the tile so grab bars can be added the day they are needed rather than surface mounted in a panic, comfort height toilets and vanities, lever handles instead of knobs, and lighting engineered for aging eyes rather than for a magazine photo. Done properly none of this reads as institutional. It reads as a good bathroom that happens to work for the next twenty years.
Blocking costs almost nothing during a remodel and is a demolition project to add later. We install it in every bath we build regardless of whether you need grab bars today.

Zero threshold shower entry with the floor plane engineered for drainage. Nothing to step over, now or later, with no visible ramp or transition.
Solid blocking installed behind the tile at every location a grab bar could ever be needed. Add hardware in an afternoon instead of gutting a wall.
Comfort height toilet, vanity set to a workable height, lever handles throughout, and layered lighting that raises light levels without glare.
Proudly serving Fountain Hills, Rio Verde, Fort McDowell, Scottsdale, Mesa and Paradise Valley for 19+ years.
Ten services built around what Fountain Hills homes actually need. Thirty year old kitchens, garden tubs nobody uses, cabinetry that has spent three decades in low humidity, and view driven floorplans that were never opened up the way they should have been.

Our crews work daily across the Fountain Hills hillside plats and out along the Beeline corridor, so we already know which lots fall under NPOA deed restrictions, which need a TOPPS permit pulled before demolition, and how the Sanitary District wants plumbing relocations coordinated. That local knowledge travels with us into every surrounding community we serve.
Frequently Asked Questions
Kitchen And Bath Remodeling can be complex, and we’re here to provide answers to common questions. Here are some frequently asked questions from our clients.
If your lot is one of roughly 4,100 parcels under the Neighborhood Property Owners Association, exterior changes tied to a remodel do trigger Neighborhood Committee of Architecture review. That includes window openings, patio work, walls, and demolition. The committee meets the first and third Wednesday of each month at 8:30 a.m. and compliance deposits apply. We verify your plat status before we quote.
No, and the difference matters. The NPOA is an Arizona nonprofit corporation enforcing a recorded Declaration of Reservations. It is not a planned community under Arizona's Planned Community Act and it collects no regular dues. What it does hold is architectural authority over your lot, which is why a remodel that changes anything visible from outside needs to move through NCOA before a permit gets pulled.
Structural changes, plumbing relocation, and electrical alterations require a building permit through the Town of Fountain Hills TOPPS system, administered by the Building Safety Division. Cosmetic work such as a straight vanity swap generally does not. If your project relocates a drain or moves a wall, expect a permit and expect Sanitary District coordination on top of it.
The Sanitary District is a separate governmental entity from the Town. Any project that moves plumbing or adds fixture load needs coordination with both bodies, not just one. Homeowners routinely find this out midway through a project, which is exactly the kind of delay we plan around at the front end.
Plan on ten to sixteen weeks of active construction for a full gut, plus four to eight weeks in front for design, cabinet lead time, NCOA review if your plat requires it, and permitting. Hillside lots with structural wall removal run longer. We give you a real calendar before we start, not an optimistic one.
Yes. With a 16.3 percent vacancy rate here, seasonal ownership is normal and summer is our busiest execution window. We handle key access, weekly photo documentation, material approvals by video call, and a full walkthrough when you return. Decisions get made during your occupancy months and executed while the house sits empty.
Before you need it. Adding blocking and a curbless entry during a planned remodel costs almost nothing. Retrofitting them after a fall is a demolition project done under pressure.
No. It goes behind the tile during construction. The wall looks identical, and the day you want a grab bar it takes an hour instead of a week.
Layered light with higher overall levels and no glare. That means recessed general light, a lit vanity at face height, and often a low level night path light.
For most Fountain Hills homeowners, yes. It changes daily use immediately, not just eventually, and it costs nothing extra to specify at the outset.
Staying in your Fountain Hills home means the bathroom has to keep up. Let us design one that works now and works in fifteen years.
We pride ourselves on delivering great results and experiences for each client. Hear directly from home and business owners who’ve trusted us with their Kitchen And Bath Remodeling needs.

They pulled the NCOA submission together for us before we ever signed a contract. Our 1994 kitchen had the original oak boxes and a dropped soffit running the whole length of the room. It is unrecognizable now, and the whole thing was permitted properly.
Margaret Ellison, Sunridge Canyon

We live in Minnesota nine months a year. They ran our master bath demo and rebuild while the house was empty, sent photo updates every Friday, and it was finished and clean when we flew back in October. Zero surprises.
Doug Vasquez, Firerock

Converted a garden tub we never used into a curbless walk in shower with grab bar blocking behind the tile. My husband is 74 and it changed how he uses that bathroom. They understood what we needed without us explaining it twice.
Carol Whitfield, Eagles Nest
Ready to hear more about expert services at ?
Contact us today to receive a detailed, no-obligation quote.