People buy in Fountain Hills for the view. Then they cook in a kitchen with a wall between them and it. The floorplans built through the nineties compartmentalized the kitchen the way that era did, and the result is a room sited on a hillside lot with a McDowell view and a sightline to a wall. Opening it up is structural work. Load bearing assessment comes first, then the beam sizing, then the permit, then the demolition. Done right, you get a pass through counter, an expanded window opening, and a kitchen that finally uses the lot it sits on.
Load bearing wall removal on a hillside lot requires engineering and a permit. We bring the engineer in early so the design does not get rebuilt around a surprise.

Engineer reviews the wall, the beam gets sized, and the permit gets pulled. Nothing comes down until we know exactly what is holding the roof up.
Beam set, header framed, and the ceiling detailed so the removal reads as intentional design rather than as a patched over scar.
Window expansion, pass through counter, and sightline planning so the kitchen finally sees what the lot was bought for.
Proudly serving Fountain Hills, Rio Verde, Fort McDowell, Scottsdale, Mesa and Paradise Valley for 19+ years.
Ten services built around what Fountain Hills homes actually need. Thirty year old kitchens, garden tubs nobody uses, cabinetry that has spent three decades in low humidity, and view driven floorplans that were never opened up the way they should have been.

Our crews work daily across the Fountain Hills hillside plats and out along the Beeline corridor, so we already know which lots fall under NPOA deed restrictions, which need a TOPPS permit pulled before demolition, and how the Sanitary District wants plumbing relocations coordinated. That local knowledge travels with us into every surrounding community we serve.
Frequently Asked Questions
Kitchen And Bath Remodeling can be complex, and we’re here to provide answers to common questions. Here are some frequently asked questions from our clients.
If your lot is one of roughly 4,100 parcels under the Neighborhood Property Owners Association, exterior changes tied to a remodel do trigger Neighborhood Committee of Architecture review. That includes window openings, patio work, walls, and demolition. The committee meets the first and third Wednesday of each month at 8:30 a.m. and compliance deposits apply. We verify your plat status before we quote.
No, and the difference matters. The NPOA is an Arizona nonprofit corporation enforcing a recorded Declaration of Reservations. It is not a planned community under Arizona's Planned Community Act and it collects no regular dues. What it does hold is architectural authority over your lot, which is why a remodel that changes anything visible from outside needs to move through NCOA before a permit gets pulled.
Structural changes, plumbing relocation, and electrical alterations require a building permit through the Town of Fountain Hills TOPPS system, administered by the Building Safety Division. Cosmetic work such as a straight vanity swap generally does not. If your project relocates a drain or moves a wall, expect a permit and expect Sanitary District coordination on top of it.
The Sanitary District is a separate governmental entity from the Town. Any project that moves plumbing or adds fixture load needs coordination with both bodies, not just one. Homeowners routinely find this out midway through a project, which is exactly the kind of delay we plan around at the front end.
Plan on ten to sixteen weeks of active construction for a full gut, plus four to eight weeks in front for design, cabinet lead time, NCOA review if your plat requires it, and permitting. Hillside lots with structural wall removal run longer. We give you a real calendar before we start, not an optimistic one.
Yes. With a 16.3 percent vacancy rate here, seasonal ownership is normal and summer is our busiest execution window. We handle key access, weekly photo documentation, material approvals by video call, and a full walkthrough when you return. Decisions get made during your occupancy months and executed while the house sits empty.
Not without an engineer. If it is load bearing, and many are in these floorplans, it needs a properly sized beam and a permit. We establish that before design, not during demolition.
Structural wall removal does, through TOPPS. That is not optional and it is not a formality, since the inspection protects you as much as it protects the Town.
Frequently the best move on a view lot, and it is also the thing most likely to trigger NCOA review if you are on an NPOA plat. We check your plat status first.
Eight to fourteen weeks if it is paired with a kitchen remodel, which it usually is. Engineering and permitting add time in front of construction.
You bought a view. Let us open the kitchen up to it properly, with the structural work engineered and permitted the way it should be.
We pride ourselves on delivering great results and experiences for each client. Hear directly from home and business owners who’ve trusted us with their Kitchen And Bath Remodeling needs.

They pulled the NCOA submission together for us before we ever signed a contract. Our 1994 kitchen had the original oak boxes and a dropped soffit running the whole length of the room. It is unrecognizable now, and the whole thing was permitted properly.
Margaret Ellison, Sunridge Canyon

We live in Minnesota nine months a year. They ran our master bath demo and rebuild while the house was empty, sent photo updates every Friday, and it was finished and clean when we flew back in October. Zero surprises.
Doug Vasquez, Firerock

Converted a garden tub we never used into a curbless walk in shower with grab bar blocking behind the tile. My husband is 74 and it changed how he uses that bathroom. They understood what we needed without us explaining it twice.
Carol Whitfield, Eagles Nest
Ready to hear more about expert services at ?